

Abstract
Rapid growth in Springville and Mapleton has created the need for a direct connection
between Dry Creek Parkway and US-80. Current Conditions limit mobility and increase
future congestion. The project must overcome constraints including residential areas,
a railroad crossing , and highway geometry, while minimizing impacts and maintaining
safe design.